Schwarme windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Schwarme
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 13 MW
- Estimated annual production: 32 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2000/01
- 1 turbine(s) Dewind D6-1000 (power 1000 kW, diameter 62 m)
- Hub height: 68.5 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2000/03
- 1 turbine(s) Dewind D6-1000 (power 1000 kW, diameter 62 m)
- Hub height: 68.5 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2000/04
- 1 turbine(s) Dewind D6-1000 (power 1000 kW, diameter 62 m)
- Hub height: 68.5 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #4:
- 5 turbine(s) (manufacturer name not available)
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Developed by: Windstrom
- Operator: Windstrom
- Owner: Windstrom
Update for this sheet: 05/2012
Complete/correct this sheet: contact page