Nidderau-Erbstadt windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Nidderau-Erbstadt
- Country: Germany
- County / Zone: Hessen
- Total power: 3 MW
- Estimated annual production: 7 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2002/06
- 2 turbine(s) Dewind D4 (power 600 kW, diameter 48 m)
- Hub height: 70 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2002/08
- 1 turbine(s) Dewind D4 (power 600 kW, diameter 48 m)
- Hub height: 70 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2002/08
- 1 turbine(s) Dewind D6-1000 (power 1000 kW, diameter 62 m)
- Hub height: 68.5 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 10/2010