Nishime windfarm (Japan)
[Back to previous page]
Generalities
- Wind farm name: Nishime
- Country: Japan
- County / Zone: Akita
- Total power: 32 MW
- Estimated annual production: 79 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Nishime
- Commissioning: 2004/12
- 1 turbine(s) Dewind D4 (power 600 kW, diameter 48 m)
- Hub height: 65 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Operator: Eurus Energy
Part #2:
- City: Nishime
- Commissioning: 2004/12
- 1 turbine(s) Dewind D6 (power 1250 kW, diameter 64 m)
- Hub height: 65 m
- Total nominal power: 1,250 kW
- Operational
- Onshore wind farm
- Operator: Eurus Energy
Part #3:
- City: Nishime
- Commissioning: 2004/12
- 15 turbine(s) Vestas V80/2000 (power 2000 kW, diameter 80 m)
- Total nominal power: 30,000 kW
- Operational
- Onshore wind farm
- Developed by: Eurus Energy
- Operator: Eurus Energy
Update for this sheet: 05/2012