Online access > Wind farms > Garlipp (Germany)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • City: Garlipp
  • Commissioning: 2001
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 1,320 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Saturday, December 10 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 53.2 %
  • Expected production: 16,840 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Garlipp
  • Commissioning: 1997/03
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 1,200 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Saturday, December 10 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 64.8 %
  • Expected production: 18,660 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 52░ 38' 37.5"
  • Longitude: 11░ 36' 49.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 52░ 38' 37.5"
  • Longitude: 11░ 36' 49.9"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 07/2015
Complete/correct this sheet: