Generalities

PDF

Details


Part #1:

  • Commissioning: 1998
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 1,000 kW
  • Operational
  • Onshore wind farm
  • Developer: REA Düren

       Production forecast

  • From Saturday, February 25 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 50.2 %
  • Expected production: 12,050 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 1999/04
  • 3 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
  • Total nominal power: 2,250 kW
  • Operational
  • Onshore wind farm
  • Developer: REA Düren

       Production forecast

  • From Saturday, February 25 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 50.2 %
  • Expected production: 27,110 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Commissioning: 2002/06
  • 1 turbine: Neg Micon NM60/1000 (power 1 000 kW, diameter 60 m)
  • Total nominal power: 1,000 kW
  • Operational
  • Onshore wind farm
  • Developer: REA Düren

       Production forecast

  • From Saturday, February 25 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 50.2 %
  • Expected production: 12,050 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 50° 42' 33.7"
  • Longitude: 6° 21' 40.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 50° 42' 33.7"
  • Longitude: 6° 21' 40.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 50° 42' 33.7"
  • Longitude: 6° 21' 40.9"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 07/2015