Part #1:

  • Commissioning: 1998
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 1,000 kW
  • Operational
  • Onshore wind farm
  • Developer: REA Düren

       Production forecast

  • From Wednesday, June 29 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 36.6 %
  • Expected production: 8,790 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 1999/04
  • 3 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
  • Total nominal power: 2,250 kW
  • Operational
  • Onshore wind farm
  • Developer: REA Düren

       Production forecast

  • From Wednesday, June 29 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 42.1 %
  • Expected production: 22,720 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Commissioning: 2002/06
  • 1 turbine: Neg Micon NM60/1000 (power 1 000 kW, diameter 60 m)
  • Total nominal power: 1,000 kW
  • Operational
  • Onshore wind farm
  • Developer: REA Düren

       Production forecast

  • From Wednesday, June 29 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 38.2 %
  • Expected production: 9,160 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Latitude: 50° 42' 33.7"
  • Longitude: 6° 21' 40.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 50° 42' 33.7"
  • Longitude: 6° 21' 40.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 50° 42' 33.7"
  • Longitude: 6° 21' 40.9"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 07/2015
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising