Generalities

PDF

Details



Part #1:

  • Commissioning: 1995/04
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 500 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, June 26 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 9.7 %
  • Expected production: 1,170 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2001/02
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 1,650 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, June 26 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 9.7 %
  • Expected production: 3,850 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Latitude: 51░ 5' 10.6"
  • Longitude: 8░ 5' 22.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 51░ 5' 10.6"
  • Longitude: 8░ 5' 22.3"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 07/2015
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising