Online access > Wind farms > Welchweiler (Germany)


[Back to previous page]

Generalities

PDF

Details



Part #1:

  • Commissioning: 2003
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 1,750 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Friday, July 29 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 20.9 %
  • Expected production: 8,780 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2007
  • 1 turbine: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Juwi

       Production forecast

  • From Friday, July 29 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 11.7 %
  • Expected production: 5,600 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Latitude: 49░ 34' 40.7"
  • Longitude: 7░ 30' 16.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 49░ 34' 40.7"
  • Longitude: 7░ 30' 16.8"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 07/2015