Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Artern (Germany)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • 5 turbines: (manufacturer name not available)
  • Total nominal power: 3,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Wednesday, December 07 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 11.7 %
  • Expected production: 8,430 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2002
  • 12 turbines: (manufacturer name not available)
  • Total nominal power: 12,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Wednesday, December 07 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 13.3 %
  • Expected production: 38,210 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Commissioning: 2007
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Wednesday, December 07 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 13.9 %
  • Expected production: 13,390 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 51░ 22' 18.4"
  • Longitude: 11░ 17' 16.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 51░ 22' 18.4"
  • Longitude: 11░ 17' 16.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 51░ 22' 18.4"
  • Longitude: 11░ 17' 16.6"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 07/2015
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising