Generalities

PDF

Details


Part #1:

  • Commissioning: 2002/12
  • 1 turbine: Fuhrlńnder FL MD/70 (power 1 500 kW, diameter 70 m)
  • Hub height: 65 m
  • Total nominal power: 1,500 kW
  • Operational
  • Onshore wind farm
  • Operator: Futuren

       Production forecast

  • From Sunday, December 04 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 14.8 %
  • Expected production: 5,340 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 1995/05
  • 3 turbines: Micon M1500-600 (power 600 kW, diameter 43 m)
  • Total nominal power: 1,800 kW
  • Operational
  • Onshore wind farm
  • Developer: BOREAS

       Production forecast

  • From Sunday, December 04 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 9 %
  • Expected production: 3,910 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Commissioning: 2001
  • 4 turbines: (manufacturer name not available)
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm
  • Owner: GSW

       Production forecast

  • From Sunday, December 04 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 13 %
  • Expected production: 18,720 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • Commissioning: 1994/01
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 250 kW
  • Operational
  • Onshore wind farm
  • Developer: BOREAS

       Production forecast

  • From Sunday, December 04 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 6.8 %
  • Expected production: 410 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #5:

  • Commissioning: 1994/05
  • 3 turbines: Vestas V39/500 (power 500 kW, diameter 39 m)
  • Total nominal power: 1,500 kW
  • Operational
  • Onshore wind farm
  • Developer: BOREAS

       Production forecast

  • From Sunday, December 04 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 4.5 %
  • Expected production: 540 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #6:

  • Commissioning: 2001/08
  • 1 turbine: Repower MD70 (power 1 500 kW, diameter 70 m)
  • Hub height: 65 m
  • Total nominal power: 1,500 kW
  • Operational
  • Onshore wind farm
  • Developer: BOREAS

       Production forecast

  • From Sunday, December 04 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 6.9 %
  • Expected production: 2,500 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #7:

  • Commissioning: 1999/09
  • 1 turbine: BWU BWU 48-750 (power 750 kW, diameter 48.4 m)
  • Total nominal power: 750 kW
  • Operational
  • Onshore wind farm
  • Developer: BOREAS

       Production forecast

  • From Sunday, December 04 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 6.9 %
  • Expected production: 2,500 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #8:

  • Commissioning: 2016/06
  • 1 turbine: Enercon
  • Hub height: 149 m
  • Total nominal power: 3,000 kW
  • Operational
  • Onshore wind farm
  • Developer: BOREAS

       Production forecast

  • From Sunday, December 04 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 6.9 %
  • Expected production: 2,500 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #9:

  • Commissioning: 2001/04
  • 1 turbine: GE Energy
  • Hub height: 100 m
  • Total nominal power: 1,500 kW
  • Operational
  • Onshore wind farm
  • Developer: BOREAS

       Production forecast

  • From Sunday, December 04 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 6.9 %
  • Expected production: 2,500 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 53░ 22' 49"
  • Longitude: 13░ 56' 35"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 53░ 22' 49"
  • Longitude: 13░ 56' 35"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 53░ 22' 49"
  • Longitude: 13░ 56' 35"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #4:

  • Latitude: 53░ 22' 49"
  • Longitude: 13░ 56' 35"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 53░ 22' 49"
  • Longitude: 13░ 56' 35"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Latitude: 53░ 22' 49"
  • Longitude: 13░ 56' 35"
  • Geodetic system: WGS84
  • Precise localization: no

Part #7:

  • Latitude: 53░ 22' 49"
  • Longitude: 13░ 56' 35"
  • Geodetic system: WGS84
  • Precise localization: no

Part #8:

  • Latitude: 53░ 22' 49"
  • Longitude: 13░ 56' 35"
  • Geodetic system: WGS84
  • Precise localization: no

Part #9:

  • Latitude: 53░ 22' 49"
  • Longitude: 13░ 56' 35"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 11/2016