Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol

Online access > Wind farms > Lomba Seixa (Portugal)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • Part: Lomba Seixa I
  • City: Montelegre
  • Commissioning: 2001
  • 10 turbines: Nordex N60/1300 (power 1 300 kW, diameter 60 m)
  • Hub height: 60 m
  • Total nominal power: 13,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Enersis
  • Operator: Iberwind
  • Owner: Iberwind

       Production forecast

  • From Friday, January 20 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 13.8 %
  • Expected production: 43,170 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Part: Lomba Seixa II
  • City: Montelegre
  • Commissioning: 2004
  • 8 turbines: GE Energy 1.5s (power 1 500 kW, diameter 70.5 m)
  • Hub height: 65 m
  • Total nominal power: 12,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Enersis
  • Operator: Iberwind
  • Owner: Iberwind

       Production forecast

  • From Friday, January 20 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 8.2 %
  • Expected production: 23,640 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Part: Lomba Seixa I
  • Latitude: 41░ 49' 47.9"
  • Longitude: -7░ 47' 24"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Part: Lomba Seixa II
  • Latitude: 41░ 49' 47.9"
  • Longitude: -7░ 47' 24"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Global map



Satellite view



Pictures


No photos for this wind farm.

Update for this sheet: 01/2017
Complete/correct this sheet:

Eoltech

www.thewindpower.net - 2005-2017 - all rights reserved - contact - partners - advertising