Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Freiamt (Germany)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • City: Freiamt
  • Commissioning: 2001
  • 3 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
  • Hub height: 80 m
  • Total nominal power: 5,400 kW
  • Operational
  • Onshore wind farm
  • Developer: ABO-Wind

       Production forecast

  • From Saturday, December 03 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 2.5 %
  • Expected production: 3,270 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Freiamt
  • Commissioning: 2001
  • 1 turbine: Enercon E66/2000 (power 2 000 kW, diameter 66 m)
  • Hub height: 85 m
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Saturday, December 03 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 3 %
  • Expected production: 1,450 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 48░ 10' 12.5"
  • Longitude: 7░ 54' 23.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 48░ 10' 12.5"
  • Longitude: 7░ 54' 23.9"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 10/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising