Wind power and windfarms database
Eoltech

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Linsburg (Germany)


[Back to previous page]

Generalities

PDF

Details



Part #1:

  • City: Linsburg
  • Commissioning: 1993/10
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 150 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Thursday, July 28 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 6 %
  • Expected production: 220 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Linsburg
  • Commissioning: 1997
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 1,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Thursday, July 28 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 6 %
  • Expected production: 1,440 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Linsburg
  • Commissioning: 1994
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 450 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Thursday, July 28 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 6 %
  • Expected production: 650 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Latitude: 52░ 36' 0"
  • Longitude: 9░ 19' 12"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 52░ 36' 0"
  • Longitude: 9░ 19' 12"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 52░ 36' 0"
  • Longitude: 9░ 19' 12"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 07/2015
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising