The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Hüllhorst (Germany)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • Commissioning: 2000/09
  • 2 turbines: Dewind D4 (power 600 kW, diameter 48 m)
  • Hub height: 70 m
  • Total nominal power: 1,200 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, February 26 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 90.4 %
  • Expected production: 26,050 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2008/05
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, February 26 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 80.3 %
  • Expected production: 38,560 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Commissioning: 1995/10
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 250 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, February 26 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 80.3 %
  • Expected production: 4,820 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • Commissioning: 1995/04
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 499 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, February 26 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 80.3 %
  • Expected production: 9,620 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 52° 16' 29.9"
  • Longitude: 8° 40' 7.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 52° 16' 29.9"
  • Longitude: 8° 40' 7.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 52° 16' 29.9"
  • Longitude: 8° 40' 7.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 52° 16' 29.9"
  • Longitude: 8° 40' 7.1"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 07/2015
Complete/correct this sheet:

Eoltech