Eoltech

Online access > Wind farms > Delfzijl-Zuid (Netherlands)


[Back to previous page]

Generalities

PDF

Details



Part #1:

  • Part: Part 2
  • City: Delfzijl
  • Commissioning: 2008
  • 6 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height: 85 m
  • Total nominal power: 12,000 kW
  • Operational
  • Onshore wind farm
  • Operator: Bert Wolthuis
  • Owner: KDE Energy

       Production forecast

  • From Sunday, July 24 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.4 %
  • Expected production: 1,290 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Part: Part 3
  • City: Delfzijl
  • Commissioning: 2008
  • 4 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height: 85 m
  • Total nominal power: 8,000 kW
  • Operational
  • Onshore wind farm
  • Operator: Eneco
  • Owner: Engie

       Production forecast

  • From Sunday, July 24 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.5 %
  • Expected production: 870 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Part: Part 3
  • City: Delfzijl
  • Commissioning: 2008
  • 3 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height: 85 m
  • Total nominal power: 6,900 kW
  • Operational
  • Onshore wind farm
  • Operator: Eneco
  • Owner: Engie

       Production forecast

  • From Sunday, July 24 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.4 %
  • Expected production: 650 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • Part: Part 4
  • City: Delfzijl
  • Commissioning: 2008
  • 5 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height: 85 m
  • Total nominal power: 11,500 kW
  • Operational
  • Onshore wind farm
  • Operator: Sailwind
  • Owner: KDE Energy

       Production forecast

  • From Sunday, July 24 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.5 %
  • Expected production: 1,360 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #5:

  • Part: Part 5
  • City: Delfzijl
  • Commissioning: 2008
  • 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height: 85 m
  • Total nominal power: 4,600 kW
  • Operational
  • Onshore wind farm
  • Operator: Windcentrale
  • Owner: KDE Energy

       Production forecast

  • From Sunday, July 24 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.5 %
  • Expected production: 530 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Part: Part 2
  • Latitude: 53░ 17' 4.6"
  • Longitude: 6░ 58' 2.9"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Part: Part 3
  • Latitude: 53░ 17' 4.6"
  • Longitude: 6░ 58' 2.9"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #3:

  • Part: Part 3
  • Latitude: 53░ 17' 4.6"
  • Longitude: 6░ 58' 2.9"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #4:

  • Part: Part 4
  • Latitude: 53░ 17' 4.6"
  • Longitude: 6░ 58' 2.9"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #5:

  • Part: Part 5
  • Latitude: 53░ 17' 4.6"
  • Longitude: 6░ 58' 2.9"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Global map




Satellite view




Pictures



No photos for this wind farm.

Update for this sheet: 02/2016