Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Kruibeke (Belgium)


[Back to previous page]

Generalities

PDF

Details



Part #1:

  • Part: Braemland I
  • City: Kruibeke
  • Commissioning: 2005/04
  • 3 turbines: Dewind D8.0 (power 2 000 kW, diameter 80 m)
  • Hub height: 100 m
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Fortech
  • Operator: Fortech
  • Owner: Wase Wind

       Production forecast

  • From Wednesday, September 28 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 22.2 %
  • Expected production: 32,020 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Part: Braemland II
  • City: Kruibeke
  • Commissioning: 2009
  • 2 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
  • Hub height: 98 m
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Fortech
  • Owner: Wase Wind

       Production forecast

  • From Wednesday, September 28 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 22.6 %
  • Expected production: 21,710 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Part: Braemland I
  • Latitude: 51░ 10' 42.8"
  • Longitude: 4░ 16' 42.8"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Part: Braemland II
  • Latitude: 51░ 10' 52.5"
  • Longitude: 4░ 16' 35.4"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Global map




Satellite view




Pictures



No photos for this wind farm.

Update for this sheet: 04/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising