The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Landeby (Denmark)


[Back to previous page]

Denmark wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • City: Landeby
  • Commissioning: 1997/09
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 600 kW
  • Operational
  • Onshore wind farm
  • Source: https://ens.dk/en/our-services/statistics-data-key-figures-and-energy-maps/overview-energy-sector

       Production forecast

  • From Monday, November 19 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 85.9 %
  • Expected production: 12,360 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Landeby
  • Commissioning: 1997/09
  • 2 turbines: Nordex N43/600 (power 600 kW, diameter 43 m)
  • Hub height: 46 m
  • Total nominal power: 1,200 kW
  • Operational
  • Onshore wind farm
  • Source: https://ens.dk/en/our-services/statistics-data-key-figures-and-energy-maps/overview-energy-sector

       Production forecast

  • From Monday, November 19 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 68 %
  • Expected production: 39,160 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Landeby
  • Commissioning: 1989/01
  • 1 turbine: Vestas V25/200 (power 200 kW, diameter 25 m)
  • Hub height: 30 m
  • Total nominal power: 200 kW
  • Dismantled (2010/08)
  • Onshore wind farm
  • Source: https://ens.dk/en/our-services/statistics-data-key-figures-and-energy-maps/overview-energy-sector

Part #4:

  • City: Landeby
  • Commissioning: 1989/05
  • 1 turbine: Vestas V25/200 (power 200 kW, diameter 25 m)
  • Hub height: 30 m
  • Total nominal power: 200 kW
  • Dismantled (2010/08)
  • Onshore wind farm
  • Source: https://ens.dk/en/our-services/statistics-data-key-figures-and-energy-maps/overview-energy-sector

Part #5:

  • City: Landeby
  • Commissioning: 1999/02
  • 1 turbine: Nordex N43/600 (power 600 kW, diameter 43 m)
  • Hub height: 46 m
  • Total nominal power: 600 kW
  • Operational
  • Onshore wind farm
  • Source: https://ens.dk/en/our-services/statistics-data-key-figures-and-energy-maps/overview-energy-sector

       Production forecast

  • From Monday, November 19 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 78.3 %
  • Expected production: 372,270 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #6:

  • City: Landeby
  • Commissioning: 1999/08
  • 1 turbine: Nordex N43/600 (power 600 kW, diameter 43 m)
  • Hub height: 46 m
  • Total nominal power: 600 kW
  • Operational
  • Onshore wind farm
  • Source: https://ens.dk/en/our-services/statistics-data-key-figures-and-energy-maps/overview-energy-sector

       Production forecast

  • From Monday, November 19 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 53.1 %
  • Expected production: 152,860 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 55° 4' 21"
  • Longitude: 8° 58' 21.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 55° 4' 24.5"
  • Longitude: 8° 58' 26.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 55° 4' 24.5"
  • Longitude: 8° 58' 26.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 55° 4' 24.5"
  • Longitude: 8° 58' 26.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 55° 4' 24.5"
  • Longitude: 8° 58' 26.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Latitude: 55° 4' 24.5"
  • Longitude: 8° 58' 26.2"
  • Geodetic system: WGS84
  • Precise localization: no


Update for this sheet: 16 May 2018
Complete/correct this sheet: