- City: Diepholz
- Commissioning:

- 2 turbines: Enron 1.5s (power 1 500 kW, diameter 70.5 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Windwärts
- Operator: Windwärts
- Source:

Production forecast
- From Thursday, July 07 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 66.2 %
- Expected production: 47,630 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 52° 47' 43.2"
- Longitude: 8° 47' 57.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 22 October 2018