[Back to previous page]
Generalities
|
|
Details
- Commissioning:

- 5 turbines: Vestas V82/1500 (power 1 500 kW, diameter 82 m)
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, January 23 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 13.6 %
- Expected production: 24,470 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 48° 24' 57"
- Longitude: 9° 55' 16"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 2 July 2015
Complete/correct this sheet: