Germany wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • City: Gerdshagen
  • Commissioning: 2005/12
  • 7 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
  • Hub height: 105 m
  • Total nominal power: 14,000 kW
  • Operational
  • Onshore wind farm
  • Developer: WKN AG
  • Operators: WKN AG/BGZ
  • Owner: Difko AS
  • Source: http://www.wkn-ag.de/referenzen/windparks/
  • Source: https://www.bgz-gmbh.de/betriebsfuehrung/windparks/

       Production forecast

  • From Sunday, December 08 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 94.4 %
  • Expected production: 317,250 kWh
  • Values from Weathernews Windcaster solution

Part #2:

  • City: Gerdshagen
  • Commissioning: 1992
  • 1 turbine: Enercon
  • Total nominal power: 200 kW
  • Operational
  • Onshore wind farm
  • Developers: Zopf GmbH/Windstrom
  • Operator: Zopf GmbH
  • Owner: Zopf GmbH
  • Source: http://www.zopf-gmbh.de/htm/Referenzen.htm

       Production forecast

  • From Sunday, December 08 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 88.8 %
  • Expected production: 4,260 kWh
  • Values from Weathernews Windcaster solution

Part #3:

  • City: Gerdshagen
  • Commissioning: 1995
  • 1 turbine: Micon M750 (power 250 kW, diameter 31 m)
  • Total nominal power: 250 kW
  • Operational
  • Onshore wind farm
  • Developers: Zopf GmbH/Windstrom
  • Operator: Zopf GmbH
  • Owner: Zopf GmbH
  • Source: http://www.zopf-gmbh.de/htm/Referenzen.htm

       Production forecast

  • From Sunday, December 08 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 88.8 %
  • Expected production: 5,330 kWh
  • Values from Weathernews Windcaster solution

Part #4:

  • City: Gerdshagen
  • Commissioning: 1994
  • 2 turbines: Micon M750 (power 250 kW, diameter 31 m)
  • Total nominal power: 500 kW
  • Operational
  • Onshore wind farm
  • Developers: Zopf GmbH/Windstrom
  • Operator: Zopf GmbH
  • Owner: Zopf GmbH
  • Source: http://www.zopf-gmbh.de/htm/Referenzen.htm

       Production forecast

  • From Sunday, December 08 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 77.9 %
  • Expected production: 9,350 kWh
  • Values from Weathernews Windcaster solution

Localisation


Part #1:

  • Latitude: 53° 14' 2.6"
  • Longitude: 12° 13' 14.3"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 53° 13' 42.1"
  • Longitude: 12° 14' 18.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 53° 13' 42.1"
  • Longitude: 12° 14' 18.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 53° 13' 42.1"
  • Longitude: 12° 14' 18.5"
  • Geodetic system: WGS84
  • Precise localization: no


Update for this sheet: 31 October 2019