Part #1:
- City: Veelbök
- Commissioning:

- 2 turbines: Neg Micon NM64c/1500 (power 1 500 kW, diameter 64 m)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Plan 8
- Operator: Wind7
- Source:

- Source:

Production forecast
- From Friday, July 01 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 13.2 %
- Expected production: 9,470 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Veelbök
- Commissioning:

- 2 turbines: Fuhrländer FL MD/77 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Plan 8
- Operator: Wind7
- Source:

- Source:

Production forecast
- From Friday, July 01 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 18.8 %
- Expected production: 13,510 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Veelbök
- Commissioning:

- 1 turbine: Fuhrländer FL MD/77 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developer: Plan 8
- Operator: Wind7
- Source:

- Source:

Production forecast
- From Friday, July 01 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 3.7 %
- Expected production: 1,350 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 30' 35.9"
- Longitude: 12° 3' 36"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 30' 35.9"
- Longitude: 12° 3' 36"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 53° 30' 35.9"
- Longitude: 12° 3' 36"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 20 May 2022