Part #1:

  • City: Osterholz-Scharmbeck
  • Commissioning: 2007/09
  • 4 turbines: Enercon E48/800 (power 800 kW, diameter 48 m)
  • Hub height: 55.6 m
  • Total nominal power: 3,200 kW
  • Operational
  • Onshore wind farm
  • Developer: PSEEG
  • Operator: Futuren
  • Source: http://www.pseeg.de/referenzen.html

       Production forecast

  • From Monday, August 19 2019, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 31 %
  • Expected production: 23,830 kWh
  • Values from Weathernews Windcaster solution

Part #2:

  • City: Osterholz-Scharmbeck
  • Commissioning: 2016/12
  • 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Hub height: 138 m
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Monday, August 19 2019, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 42.4 %
  • Expected production: 40,660 kWh
  • Values from Weathernews Windcaster solution

Part #3:

  • City: Osterholz-Scharmbeck
  • Commissioning: 2015/12
  • 2 turbines: Senvion 3.2M114 (power 3 200 kW, diameter 114 m)
  • Hub height: 121 m
  • Total nominal power: 6,400 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Monday, August 19 2019, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 42.4 %
  • Expected production: 5,080 kWh
  • Values from Weathernews Windcaster solution

Part #4:

  • City: Osterholz-Scharmbeck
  • Commissioning: 2001/10
  • 4 turbines: Enercon E40/600 (power 600 kW, diameter 40 m)
  • Hub height: 50 m
  • Total nominal power: 2,400 kW
  • Operational
  • Onshore wind farm
  • Developers: PNE/PSEEG
  • Source: http://www.pnewind.com/unternehmen/referenzen/
  • Source: http://www.pseeg.de/referenzen.html

       Production forecast

  • From Monday, August 19 2019, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 28.7 %
  • Expected production: 16,530 kWh
  • Values from Weathernews Windcaster solution

Part #5:

  • City: Lange Heide
  • Commissioning: 2016/05
  • 5 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Hub height: 138 m
  • Total nominal power: 11,500 kW
  • Operational
  • Onshore wind farm
  • Developer: WPD
  • Source: http://www.wpd.de/referenzen/

Localisation


Part #1:

  • Latitude: 53° 14' 28.5"
  • Longitude: 8° 44' 9.3"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 53° 14' 50.5"
  • Longitude: 8° 43' 58.6"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #3:

  • Latitude: 53° 14' 20.7"
  • Longitude: 8° 44' 33.5"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #4:

  • Latitude: 53° 14' 26.8"
  • Longitude: 8° 44' 53.3"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #5:

  • Latitude: 53° 14' 38.7"
  • Longitude: 8° 44' 33.2"
  • Geodetic system: WGS84
  • Precise localization: no


Update for this sheet: 28 February 2019