Generalities
|
|
Details
Part #1:
- City: Märkische Heide
- Commissioning: 2016/09
- 3 turbines: Vestas V126/3450 (power 3 450 kW, diameter 126 m)
- Hub height: 137 m
- Total nominal power: 10,350 kW
- Operational
- Onshore wind farm
- Developer: UKA Group
Production forecast
- From Tuesday, December 17 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 1.2 %
- Expected production: 6,390 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Schwielochsee
- Commissioning: 2014/11
- 14 turbines: Vestas V112/3300 (power 3 300 kW, diameter 112 m)
- Hub height: 140 m
- Total nominal power: 46,200 kW
- Operational
- Onshore wind farm
- Developer: UKA Group
Part #3:
- City: Schwielochsee
- Commissioning: 2015/04
- 5 turbines: Vestas V112/3300 (power 3 300 kW, diameter 112 m)
- Hub height: 140 m
- Total nominal power: 16,500 kW
- Operational
- Onshore wind farm
- Developer: UKA Group
Localisation
Part #1:
- Latitude: 51° 58' 50.3"
- Longitude: 14° 6' 38.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 58' 50.3"
- Longitude: 14° 6' 38.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 58' 50.3"
- Longitude: 14° 6' 38.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 22 February 2019