Generalities
|
|
Details
- Commissioning: 2010
- 30 turbines: Vestas
- Total nominal power: 90,000 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner: EDP Renovaveis
- Source: http://dictionnaire.sensagent.leparisien.fr/EDP%20Medgidia%20Wind%20Farm/en-en/
Production forecast
- From Saturday, February 23 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 67.7 %
- Expected production: 1,462,050 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 44° 15' 15.6"
- Longitude: 28° 17' 13.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017