Arneburg windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Arneburg
- Country: Germany
- County / Zone: Sachsen-Anhalt
- Total installed power: 65.1 MW
- Estimated annual production: 162 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 2002
- 11 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 19800 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2001
- 1 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2001
- 4 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 6400 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2001
- 3 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 1800 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 2001
- 22 turbine(s) GE 1.5sl (power 1500 kW, diameter 77 m)
- Total nominal power: 33000 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 2001
- 2 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 3600 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2011
Complete/correct this sheet: contact page