Generalities
- Wind farm name: Neusiedl an der Zaya
- Country: Austria
- County / Zone: Burgenland
- Total installed power: 9 MW
- Estimated annual production: 22 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- Commissioning: 2002/10
- 5 turbine(s) Enercon E66/1800 (power 1800 kW, diameter 66 m)
- Hub height: 86 m
- Total nominal power: 9000 kW
- Operational
- Onshore wind farm
- Operator: EVN-Naturkraft
Update for this sheet: 01/2011