El Navazo Fase I windfarm (Spain)
[Back to previous page]
Generalities
- Wind farm name: El Navazo Fase I
- Country: Spain
- County / Zone: Castilla y León
- Total installed power: 29.75 MW
- Estimated annual production: 74 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- City: Pedrosa del Príncipe
- 35 turbine(s) Gamesa G58/850 (power 850 kW, diameter 58 m)
- Total nominal power: 29750 kW
- Operational
- Onshore wind farm
- Operator: Iberdrola
Update for this sheet: 03/2011
Complete/correct this sheet: contact page