Omissy windfarm, France
[Back to previous page]
Generalities
Wind turbines
- City : Omissy
- Installation : 2007/10
- 5 turbine(s) Gamesa (turbine model not available)
- Total power : 10000 kW
Installed power and production capacity
- Total installed power : 10 MW
- Yearly estimated production (see below) : 22 GW.h
- Supplied population by this windfamr (estimation, see below) : 8800 habitants
- Computation hypothesis : private consumption including home heating