Bordecorex Norte windfarm (Spain)
[Back to previous page]
Generalities
- Wind farm name: Bordecorex Norte
- Country: Spain
- County / Zone: Castilla y León
- Total installed power: 44.35 MW
- Estimated annual production: 110 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- City: Bordecorex
- 9 turbine(s) Gamesa G80/2000 (power 2000 kW, diameter 80 m)
- Total nominal power: 18000 kW
- Operational
- Onshore wind farm
- Operator: Iberdrola
Part #2:
- City: Bordecorex
- 31 turbine(s) Gamesa G58/850 (power 850 kW, diameter 58 m)
- Total nominal power: 26350 kW
- Operational
- Onshore wind farm
- Operator: Iberdrola
Update for this sheet: 12/2011
Complete/correct this sheet: contact page