Lombardsijde - Middlekerke windfarm (Belgium)
[Back to previous page]
Generalities
- Wind farm name: Lombardsijde - Middlekerke
- Country: Belgium
- County / Zone: West-Vlaanderen
- Total installed power: 2.36 MW
- Estimated annual production: 5 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- City: Middelkerke
- Commissioning: 1999
- 1 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height: 55 m
- Total nominal power: 660 kW
- Operational
- Onshore wind farm
- Operator: Aspiravi
Part #2:
- City: Middelkerke
- Commissioning: 2003
- 1 turbine(s) Neg Micon NM52/900 (power 900 kW, diameter 52 m)
- Hub height: 60 m
- Total nominal power: 900 kW
- Operational
- Onshore wind farm
- Operator: Aspiravi
Part #3:
- City: Middelkerke
- Commissioning: 2007/06
- 1 turbine(s) Enercon E48/800 (power 800 kW, diameter 48 m)
- Hub height: 56 m
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
- Developed by: Electrawinds
- Operator: Electrawinds
Update for this sheet: 03/2011
Complete/correct this sheet: contact page