AB Tehachapi windfarm (USA)
[Back to previous page]
Generalities
- Wind farm name: AB Tehachapi
- Country: USA
- County / Zone: California
- Total installed power: 6.97 MW
- Estimated annual production: 17 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- City: Tehachapi
- Commissioning: 1992
- 31 turbine(s) Vestas (model not available)
- Total nominal power: 6970 kW
- Operational
- Onshore wind farm
- Developed by: AB Energy
- Operator: Coram Energy
- Owner: Coram Energy
Update for this sheet: 12/2011
Complete/correct this sheet: contact page