Altech 3 (a) windfarm, USA
[Back to previous page]
Generalities
- Wind farm name : Altech 3 (a)
- Country : USA
- Zone : California
Wind turbines
- City : San Gorgonio Pass
- 51 turbine(s) Neg Micon (turbine model not available)
- Total power : 3310 kW
- Developed by : SeaWest
- Operator : SeaWest
Installed power and production capacity
- Total installed power : 3.31 MW
- Yearly estimated production (see below) : 7 GW.h
- Supplied population by this windfamr (estimation, see below) : 3000 habitants
- Computation hypothesis : private consumption including home heating