Goodland I windfarm (USA)
[Back to previous page]
Generalities
- Wind farm name: Goodland I
- Country: USA
- County / Zone: Indiana
- Total installed power: 130.5 MW
- Estimated annual production: 326 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- City: Benton County
- Commissioning: 2008
- 87 turbine(s) GE (model not available)
- Total nominal power: 130500 kW
- Operational
- Onshore wind farm
- Developed by: Orion Energy LLC
- Operator: enXco
Update for this sheet: 05/2011
Complete/correct this sheet: contact page