Klondike III windfarm (USA)
[Back to previous page]
Generalities
- Wind farm name: Klondike III
- Country: USA
- County / Zone: Oregon
- Total installed power: 223.6 MW
- Estimated annual production: 559 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 2008
- 1 turbine(s) Mitsubishi (model not available)
- Total nominal power: 2400 kW
- Operational
- Onshore wind farm
- Developed by: PPM Energy
- Operator: Iberdrola
- Owner: Iberdrola Renewables
Part #2:
- City: Sherman County
- Commissioning: 2007
- 44 turbine(s) Siemens (model not available)
- Total nominal power: 101200 kW
- Operational
- Onshore wind farm
- Developed by: PPM Energy
- Operator: Iberdrola
- Owner: Iberdrola Renewables
Part #3:
- City: Sherman County
- Commissioning: 2007
- 80 turbine(s) GE (model not available)
- Total nominal power: 120000 kW
- Operational
- Onshore wind farm
- Developed by: PPM Energy
- Operator: Iberdrola
- Owner: Iberdrola Renewables
Update for this sheet: 11/2011
Complete/correct this sheet: contact page