Klondike II windfarm (USA)
[Back to previous page]
Generalities
- Wind farm name: Klondike II
- Country: USA
- County / Zone: Oregon
- Total installed power: 75 MW
- Estimated annual production: 187 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- City: Wasco
- Commissioning: 2005
- 50 turbine(s) GE (model not available)
- Total nominal power: 75000 kW
- Operational
- Onshore wind farm
- Developed by: PPM Energy
- Operator: Iberdrola
- Owner: Iberdrola Renewables
Update for this sheet: 05/2011
Complete/correct this sheet: contact page