Horse Hollow II windfarm, USA
[Back to previous page]
Generalities
Wind turbines
- City : Taylor County
- Installation : 2006
- 130 turbine(s) Siemens (turbine model not available)
- Total power : 299000 kW
Installed power and production capacity
- Total installed power : 299 MW
- Yearly estimated production (see below) : 687 GW.h
- Supplied population by this windfamr (estimation, see below) : 275000 habitants
- Computation hypothesis : private consumption including home heating