Woodward Mountain I & II windfarm, USA
[Back to previous page]
Generalities
Wind turbines
- City : Pecos County
- Installation : 2001
- 242 turbine(s) Vestas (turbine model not available)
- Total power : 159720 kW
Installed power and production capacity
- Total installed power : 159.72 MW
- Yearly estimated production (see below) : 367 GW.h
- Supplied population by this windfamr (estimation, see below) : 146900 habitants
- Computation hypothesis : private consumption including home heating