Barendorf windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Barendorf
- Country: Germany
- County / Zone: Hamburg
- Total installed power: 33.6 MW
- Estimated annual production: 84 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 2005
- 2 turbine(s) Vestas V82/1500 (power 1500 kW, diameter 82 m)
- Total nominal power: 3000 kW
- Operational
- Onshore wind farm
- Developed by: WPD
Part #2:
- Commissioning: 2001
- 7 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 12600 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2002
- 10 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 18000 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2010