Elster II windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Elster II
- Country: Germany
- County / Zone: Sachsen-Anhalt
- Total installed power: 42 MW
- Estimated annual production: 105 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- City: Elster
- Commissioning: 2001
- 20 turbine(s) Enercon E40/600 (power 600 kW, diameter 40 m)
- Total nominal power: 42000 kW
- Operational
- Onshore wind farm
- Developed by: WPD
- Operator: WSB Neue Energien GmbH
Update for this sheet: 12/2010
Complete/correct this sheet: contact page