Bromskirchen windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Bromskirchen
- Country: Germany
- County / Zone: Hessen
- Total installed power: 2.5 MW
- Estimated annual production: 6 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- Commissioning: 1996
- 5 turbine(s) Enercon E40/500 (power 500 kW, diameter 40 m)
- Total nominal power: 2500 kW
- Operational
- Onshore wind farm
- Developed by: WPD
Update for this sheet: 12/2010
Complete/correct this sheet: contact page