Wind farms
Kleisthöhe (Germany)| Kleisthöhe (Germany) |
|
| Operational (36,1 MW) |

| Country | Germany |
| County/Zone | Brandenburg |
| City | Uckerland |
| Wind farm type | Onshore wind farm |

![]() | 16.1 MW commissioned |
![]() | 15 MW commissioned |
![]() | 5 MW commissioned |

| Developer | #ND |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 2.5xl (x 8) |
| Operational | GE Vernova (x 7) |

![]() | |

| City | Uckerland |
| Commissioning | ![]() |
| Turbines | 7x GE Vernova |
| Hub height | ![]() |
| Total nominal power | 16,100 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 53° 25' 54.3" - Longitude 13° 44' 57" |
| Precise localization | Yes |
| City | Uckerland |
| Commissioning | ![]() |
| Turbines | 2x GE Vernova 2.5xl (power 2,500 kW, diameter 100 m) |
| Hub height | ![]() |
| Total nominal power | 5,000 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 53° 26' 26.7" - Longitude 13° 44' 44.1" |
| Precise localization | Yes |
| City | Uckerland |
| Commissioning | ![]() |
| Turbines | 6x GE Vernova 2.5xl (power 2,500 kW, diameter 100 m) |
| Hub height | ![]() |
| Total nominal power | 15,000 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 53° 26' 26.7" - Longitude 13° 44' 44.1" |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms F8 Flaggenpfuhl (2 km) F7 Flaggenpfuhl (2 km) F5 Flaggenpfuhl (2 km) F6 Flaggenpfuhl (2 km) Lübbenow (3 km) Uckerland (4 km) Milow III (6 km) Beesenberg II (8 km) Beesenberg (8 km) Wismar (Brandenburg) (8 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Brandenburg : 10,012.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 31 May 2022 |
||