Wattenmeer windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Wattenmeer
- Country: Germany
- Total installed power: 8.6 MW
- Estimated annual production: 21 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 2008
- 1 turbine(s) Enercon E53/800 (power 800 kW, diameter 52.9 m)
- Hub height: 73 m
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
- Operator: Natenco
Part #2:
- Commissioning: 2001/08
- 13 turbine(s) Repower (model not available)
- Hub height: 65 m
- Total nominal power: 7800 kW
- Operational
- Onshore wind farm
- Operator: Natenco
Update for this sheet: 10/2010
Complete/correct this sheet: contact page