Nauendorf windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Nauendorf
- Country: Germany
- County / Zone: Thüringen
- Total installed power: 7.5 MW
- Estimated annual production: 18 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 1999/03
- 1 turbine(s) Enercon E66/1500 (power 1500 kW, diameter 66 m)
- Hub height: 67 m
- Total nominal power: 1500 kW
- Operational
- Onshore wind farm
- Operator: Natenco
Part #2:
- Commissioning: 1999
- 4 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 6000 kW
- Operational
- Onshore wind farm
Update for this sheet: 02/2011