Appensee windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Appensee
- Country: Germany
- County / Zone: Baden-Württemberg
- Total installed power: 2 MW
- Estimated annual production: 5 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- Commissioning: 2007/11
- 1 turbine(s) Repower MM92 (power 2000 kW, diameter 92 m)
- Hub height: 80 m
- Total nominal power: 2000 kW
- Operational
- Onshore wind farm
- Developed by: SeeBA EnergyFarming
- Operator: Natenco
Update for this sheet: 01/2011