Abbey Group - Ramsey Site windfarm, United-Kingdom
[Back to previous page]
Generalities
Wind turbines
- City : Cambridgeshire
- Installation : 2005/01
- 1 turbine(s) Vestas (turbine model not available)
- Total power : 225 kW
- Developed by : Fivestone Ltd
Installed power and production capacity
- Total installed power : 0.225 MW
- Yearly estimated production (see below) : 0 GW.h
- Supplied population by this windfamr (estimation, see below) : 200 habitants
- Computation hypothesis : private consumption including home heating