St Lawrence windfarm (Canada)
[Back to previous page]
Generalities
- Wind farm name: St Lawrence
- Country: Canada
- County / Zone: Terre-Neuve-et-Labrador
- Total installed power: 27 MW
- Estimated annual production: 67 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- Commissioning: 2008/11
- 9 turbine(s) Vestas V90/3000 (power 3000 kW, diameter 90 m)
- Total nominal power: 27000 kW
- Operational
- Onshore wind farm
- Operator: NeWind
Update for this sheet: 11/2011
Complete/correct this sheet: contact page