Le Moulin Démoli windfarm (France)
[Back to previous page]
Generalities
- Wind farm name: Le Moulin Démoli
- Country: France
- County / Zone: 60
- Total installed power: 11.5 MW
- Estimated annual production: 28 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- City: Lihus
- Commissioning: 2006/12
- 5 turbine(s) Nordex N90/2300 (power 2300 kW, diameter 90 m)
- Hub height: 80 m
- Total nominal power: 11500 kW
- Operational
- Onshore wind farm
- Developed by: Nordex
- Operator: ERG
Update for this sheet: 08/2011
Complete/correct this sheet: contact page