Mont Mau windfarm, France
[Back to previous page]
Generalities
Wind turbines
- City : Mont Dore
- Installation : 2007/12
- 15 turbine(s) Vergnet GEV MP 275 (puissance de 275 kW, diamètre de 32 m)
- Total power : 4125 kW
- Total wings surface : 12065 m²
- Nouvelle Calédonie
Installed power and production capacity
- Total installed power : 4.125 MW
- Yearly estimated production (see below) : 7 GW.h
- Supplied population by this windfamr (estimation, see below) : 2900 habitants
- Computation hypothesis : private consumption including home heating