Sange (No.1) windfarm, China
[Back to previous page]
Generalities
- Wind farm name : Sange (No.1)
- Country : China
- Zone : Sinkiang
Wind turbines
Part 1 : Part 2 : Part 3 : Part 4 : Part 5 : - City : Dabancheng
- Installation : 1998/12
- 5 turbine(s) (manufacturer name not available) (turbine model not available)
- Total power : 3000 kW
- XWEC-Jacobs
Part 6 : - City : Dabancheng
- Installation : 1999/10
- 4 turbine(s) (manufacturer name not available) (turbine model not available)
- Total power : 2400 kW
- XWEC-Jacobs
Installed power and production capacity
- Total installed power : 40.26 MW
- Yearly estimated production (see below) : 92 GW.h
- Supplied population by this windfamr (estimation, see below) : 37000 habitants
- Computation hypothesis : private consumption including home heating