Barsinghausen windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Barsinghausen
- Country: Germany
- County / Zone: Niedersachsen
- Total installed power: 23.75 MW
- Estimated annual production: 59 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 1998/09
- 1 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2005/11
- 2 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 10000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1996/10
- 1 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #4:
Part #5:
- Commissioning: 2000/06
- 1 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 1500 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 2009/05
- 3 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 6900 kW
- Operational
- Onshore wind farm
Update for this sheet: 11/2010
Complete/correct this sheet: contact page