Chemin d’Ablis windfarm (France)
[Back to previous page]
Generalities
- Wind farm name: Chemin d’Ablis
- Country: France
- County / Zone: 28
- Total installed power: 52 MW
- Estimated annual production: 130 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- City: Léthuin, Neuvy-en-Beauce, Baudreville, Gouillons, Vierville
- Commissioning: 2008/11
- 26 turbine(s) Repower MM92 (power 2000 kW, diameter 92 m)
- Hub height: 74 m
- Total nominal power: 52000 kW
- Operational
- Onshore wind farm
- Developed by: EDF-EN
- Operator: EDF-EN
- Owner: EDF-EN
Update for this sheet: 12/2011
Complete/correct this sheet: contact page